Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Answer(20,000 prospects) x (8 actions) = total of 160,000 actions to be applied. Up to 500 actions are applied every minute. To calculate the time required for the automation to complete we take (160,000 actions) / (500 actions per minute) = 320 minutes, which will take approximately 5 hours and 20 minutes to complete. 

Let consider another scenario. In the second scenario, what if there were only 10 prospects in Step 1 and 8 actions in Step 2? What's the formula for each scenario?   Assume all 8 actions are Lead Scoring actions.

Answer: (10 prospects) x (8 actions) = total of 80 actions to be applied. Since 80 is < 500 (max per minute) each action would be applied to all prospects within 1 minute. Keep in mind it would take 8 minutes to run all 8 actions since each action within an automation runs every minute. 

...